• Information
  • News Stands
  • Advertise
Thursday, March 19, 2026
The Anguillian Newspaper - The Weekly Independent Paper of Anguilla
The Independent Newspaper of Anguilla
The price of freedom is eternal vigilance - Thomas Jefferson
SUBSCRIBE
  • News
    • Local News
    • Front Page
  • Publications
    • Columns
      • Ask Your Doctor
      • Articles
  • Business
  • Tourism
  • Sports
  • Education
  • Health
No Result
View All Result
  • News
    • Local News
    • Front Page
  • Publications
    • Columns
      • Ask Your Doctor
      • Articles
  • Business
  • Tourism
  • Sports
  • Education
  • Health
No Result
View All Result
The Anguillian Newspaper - The Weekly Independent Paper of Anguilla
No Result
View All Result
Home Publications Business

NEW BUILDING PROJECT AT DEPARTMENT OF INFRASTRUCTURE Late Start for School Buildings

September 3, 2018
0 0
0
SHARES
0
VIEWS
Share TweetSendEmail

 

 


As part of the hurricane recovery programme in Anguilla, a new building of over 500 square feet is under construction at the premises of the Department of Infrastructure in The Valley. The original storage building was destroyed or otherwise severely damaged by Hurricane Irma in September 2017, among other Government buildings and offices.

ADVERTISEMENT ADVERTISEMENT ADVERTISEMENT
ADVERTISEMENT

Excavation work, on the edge of the Government’s agricultural lands, has just begun by the contractors who satisfied the bidding processes. While it is a welcome project for the Ministry and Department of Infrastructure, the Minister, Mr. Curtis Richardson, would have preferred if there was a different location.
“I would not have put back the building there because it is a flood area,” he told media representatives accompanying him on a school bags and books distribution tour across the island on Monday, August 27. “I would have liked to move the public works from there, and I felt that the hurricane was an opportune time for us to correct a lot of things that were wrong in Anguilla.” He spoke against the background that, as a result of Hurricane Lenny in November 1999, The Valley area was flooded by some 15 feet of water.
Mr. Richardson continued: “I would have liked a location on the hill overlooking the airport. I really think we need to get out of the flood zone. It has only happened to us once in a hundred years, but once sometimes is enough to have a tragedy in life so I would have liked to avoid that risk. However, looking at all the factors, we are forging ahead to put a building back there.
“The building is for storage purposes for some of the equipment, including generators and other materials, we have for the Department of Infrastructure. The British Government has given us some financial assistance for the first set of projects that were approved. We have a second set of projects that should now be approved and these should include the Blowing Port project.”
Meanwhile, Mr. Richardson said that the rebuilding of some portions of The Valley Primary School and the Adrian T. Hazell Primary School should start pretty soon”. He went on: “We were trying to avoid having to wait until after the reopening of the schools, but it is just the way we are working with the British Government. There is a lot of paper work. We have to go through a procurement process and there were a lot of delays to get started. It is an unfortunate late start, and a whole year after the hurricane, but we give God thanks that we will have a better learning environment for the children in Anguilla.”

The Minister also expressed his desire to see the rebuilding of the Morris Vanterpool Primary School at East End. That school building was badly damaged and otherwise compromised by Hurricane Irma necessitating the renting of three private apartments.

ADVERTISEMENT ADVERTISEMENT ADVERTISEMENT
ADVERTISEMENT
Previous Post

ANGUILLIANS IN SLOUGH PLEASED WITH HOMELAND

Next Post

PRESS STATEMENT ON THE REDEVELOPMENT OF THE ALBENA LAKE HODGE COMPREHENSIVE SCHOOL (ALHCS)

Next Post
GLOWING TRIBUTES TO SIR EMILE BY HOUSE OF ASSEMBLY

PRESS STATEMENT ON THE REDEVELOPMENT OF THE ALBENA LAKE HODGE COMPREHENSIVE SCHOOL (ALHCS)

STAY CONNECTED

RECENT NEWS

JUVENILE CARE WORKERS TRAINED IN TRAUMA MANAGEMENT

JUVENILE CARE WORKERS TRAINED IN TRAUMA MANAGEMENT

March 17, 2026
ALBENA LAKE-HODGE STUDENTS CELEBRATE CHINESE NEW YEAR WITH COLOUR, CULTURE AND COMMUNITY SPIRIT

ALBENA LAKE-HODGE STUDENTS CELEBRATE CHINESE NEW YEAR WITH COLOUR, CULTURE AND COMMUNITY SPIRIT

March 17, 2026
PARLIAMENTARY OPPOSITION MEMBER CALLS FOR URGENT INSTALLATION OF ISLANDWIDE CCTV

PARLIAMENTARY OPPOSITION MEMBER CALLS FOR URGENT INSTALLATION OF ISLANDWIDE CCTV

March 17, 2026
OUR CHILDREN DESERVE BETTER

SYSTEMS FAIL WHEN PEOPLE FAIL

March 17, 2026

– A D V E R T I S E M E N T –

  • Home
  • Info
  • News Stands
  • Advertise

© 2020-2021 The Anguillian Newspaper - Developed by SoCreative.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • News
    • Front Page News
    • Local News
    • Regional News
  • Publications
    • Editorial
    • Art
    • Columns
      • Ask Your Doctor
      • Letters
      • Articles
    • Music
    • People
  • Business
  • Education
  • Health
  • Tourism
  • Sports

© 2020-2021 The Anguillian Newspaper - Developed by SoCreative.

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?